A structured session, and a written output, that goes through everything with the potential to move the cost or the programme. Ground conditions, existing services, access constraints, planning conditions, long lead items, phasing. The significant items get an allowance attached rather than a note saying "to be confirmed", which is where most budget overruns are quietly born.